{"id":35411,"date":"2026-07-27T08:00:55","date_gmt":"2026-07-27T06:00:55","guid":{"rendered":"https:\/\/dev.nvalue.com\/?p=35411"},"modified":"2026-07-27T13:55:59","modified_gmt":"2026-07-27T11:55:59","slug":"electrification-action-plan-and-ets-review","status":"publish","type":"post","link":"https:\/\/dev.nvalue.com\/it\/regulatory-it\/electrification-action-plan-and-ets-review\/","title":{"rendered":"Electrification Action Plan and ETS review"},"content":{"rendered":"<h1>The package at a glance<\/h1>\n<div>\n<p>On 17 July 2026, the European Commission proposed a major overhaul of the EU ETS for Phase 5 (2031\u20132040). The reform aims to balance industrial competitiveness with the EU&#8217;s 90% net emissions reduction target by 2040, while supporting electrification and investment in low-carbon technologies.<\/p>\n<ul>\n<li class=\"isSelectedEnd\"><span>Still a proposal: Parliament and Council negotiation is expected to run into 2027, and details will move<\/span><\/li>\n<li class=\"isSelectedEnd\"><span>Paired with a target to double electrification&#8217;s share of final energy demand<\/span><\/li>\n<li><span>Framed as the foundation for the EU&#8217;s 2040 target of a 90% net emissions cut<\/span><\/li>\n<\/ul>\n<\/div>\n<ul>\n<li>\n<h3>3.7%<\/h3>\n<div>\n<p>Annual cap reduction factor\u000b2031\u20132035, down from 4.4%<\/p>\n<\/div>\n<\/li>\n<li>\n<h3>+4 years<\/h3>\n<div>\n<p>Free allocation extended beyond the current phase-out<\/p>\n<\/div>\n<\/li>\n<li>\n<h3>12% <\/h3>\n<div>\n<p>Proposed MSR intake rate\u000b(down from 24%)<\/p>\n<\/div>\n<\/li>\n<\/ul>\n<h1>The cap slows, free allocation persists with new strings attached<\/h1>\n<div>\n<p>Annual cap reduction rate (linear reduction factor)<\/p>\n<\/div>\n<p><img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/07\/Screenshot-2026-07-24-142231.png\" alt=\"\"><\/p>\n<div>\n<p><i>Compares with a current Fit-for-55 baseline of 4.3% (2024-27) then 4.4% (2028+): a materially more gradual decline that eases near-term scarcity but stretches the path to 2040.<\/i><\/p>\n<\/div>\n<div>\n<ul>\n<li>Slower cap reduction could ease EUA scarcity after 2030.<\/li>\n<li>Free allocation would continue until 2038, four years longer than under Fit-for-55.<\/li>\n<li>Companies would need to demonstrate credible decarbonization investments to retain full allocation.<\/li>\n<li>Sector benchmarks will continue to determine allocation volumes.<\/li>\n<\/ul>\n<\/div>\n<h1>\n<p>New flexibility mechanisms<\/p>\n<\/h1>\n<ul>\n<li>\n<h3>1. Carbon removals<\/h3>\n<div>CRCF-certified permanent removals enter the cap via a 250 million allowance increase, ramping to 48 Mt a year by 2040 (an estimated \u20ac50bn market). Only BioCCS and DACCS qualify initially, other pathways are excluded for now. Three integration models remain under review: central public purchase, operator-led procurement and surrender, and a one-in-one-out mechanism.\n<\/div>\n<\/li>\n<li>\n<h3>2. Market Stability Reserve<\/h3>\n<div>\n<p>The MSR is repositioned as a standing strategic reserve rather than a mechanical valve. The automatic invalidation of allowances above the current threshold is being scrapped in favour of retaining them as a stability buffer.<\/p>\n<\/div>\n<\/li>\n<\/ul>\n<h1>\u0422he ETS ecosystem in Phase 5<\/h1>\n<ul>\n<li>\n<h3>Scope expansion<\/h3>\n<div>\n<div class=\"uk-first-column\">\n<div class=\"el-item uk-card uk-card-default uk-card-small uk-card-body uk-margin-remove-first-child\" data-id=\"page#0-2-1-11-0\">\n<div class=\"el-content uk-panel uk-margin-top\">\n<p>Municipal waste incineration is proposed to become a permanent part of the EU ETS from 2028. <\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<h3>Industrial Decarbonisation Bank<\/h3>\n<div>\n<div class=\"el-item uk-card uk-card-default uk-card-small uk-card-body uk-margin-remove-first-child\" data-id=\"page#0-2-1-11-1\">\n<div class=\"el-content uk-panel uk-margin-top\">\n<p>A new EU financing mechanism from 2028, directing ETS revenues towards industrial decarbonisation and carbon removals. Its first phase (2028\u20132031) reserves 400 million EUAs for an Investment Booster paying fixed carbon premia, first-come first-served, with a share reserved for lower-income states.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<h3>Revenue use<\/h3>\n<div>\n<div class=\"uk-grid-margin uk-first-column\">\n<div class=\"el-item uk-card uk-card-default uk-card-small uk-card-body uk-margin-remove-first-child\" data-id=\"page#0-2-1-11-2\">\n<div class=\"el-content uk-panel uk-margin-top\">\n<p>Channelling is simplified through the Industrial Decarbonisation Fund and the Innovation Fund, with a stated aim of directing industry-linked revenue back to industry.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<h3>ETS1\u2013ETS2 interaction<\/h3>\n<div>\n<div class=\"uk-grid-margin uk-first-column\">\n<div class=\"el-item uk-card uk-card-default uk-card-small uk-card-body uk-margin-remove-first-child\" data-id=\"page#0-2-1-11-2\">\n<div class=\"el-content uk-panel uk-margin-top\">\n<p>The proposal strengthens coordination between ETS1 and ETS2 to ensure a more coherent carbon pricing framework.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/li>\n<\/ul>\n<h1>\n<p>What this means for you<\/p>\n<\/h1>\n<ul>\n<li>\n<h3>1<\/h3>\n<div>\n<p>Free allocation isn&#8217;t disappearing, conditionality is the new compliance risk to plan around.<\/p>\n<\/div>\n<\/li>\n<li>\n<h3>2<\/h3>\n<div>\n<p>Carbon removals are becoming a real compliance lever; early positioning is an advantage, not just a hedge.<\/p>\n<\/div>\n<\/li>\n<li>\n<h3>3<\/h3>\n<div>\n<p>The Industrial Decarbonisation Bank and Innovation Fund, create new opportunities to finance electrification, CCS and fuel switching.<\/p>\n<\/div>\n<\/li>\n<li>\n<h3>4<\/h3>\n<div>\n<p>If you\u2019re covered by ETS2, watch the ETS1\/ETS2 coordination signal closely, it may reshape scope timing.<\/p>\n<\/div>\n<\/li>\n<\/ul>\n<h1>\n<p>What should you do next?<\/p>\n<\/h1>\n<h1>\n<h3><b>Recommended next steps <\/b><\/h3>\n<\/h1>\n<ul>\n<li>\n<h3>1<\/h3>\n<div>\n<p>Map your own free allocation exposure against the proposed conditionality criteria.<\/p>\n<\/div>\n<\/li>\n<li>\n<h3>2<\/h3>\n<div>\n<p>Put removals procurement on your 2026\u20132027 watch list if you\u2019re in a hard-to-abate sector.<\/p>\n<\/div>\n<\/li>\n<li>\n<h3>3<\/h3>\n<div>\n<p>Screen planned electrification, CCS, fuel-switching and efficiency projects for potential support through ETS funding mechanisms.<\/p>\n<\/div>\n<\/li>\n<li>\n<h3>4<\/h3>\n<div>\n<p>Revisit your plan once Parliament and Council positions emerge.<\/p>\n<\/div>\n<\/li>\n<\/ul>\n<hr>\n<div>\n<h3>Questions on how this affects you?<\/h3>\n<\/div>\n<div>\n<p>For support and guidance as these proposals develop, we\u2019re here to help you plan!<\/p>\n<\/div>\n<p><p>\n        <a href=\"https:\/\/dev.nvalue.com\/it\/contatti\/\">Contact us<\/a>\n    <\/p>\n<\/p>\n<hr>\n<p><!--more--><br \/>\n<!-- {\"type\":\"layout\",\"children\":[{\"type\":\"section\",\"props\":{\"image_position\":\"center-center\",\"style\":\"default\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"\",\"width\":\"default\"},\"children\":[{\"type\":\"row\",\"props\":{\"width\":\"small\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"type\":\"breadcrumbs\",\"props\":{\"margin\":\"default\",\"show_current\":true,\"show_home\":true}}]}]},{\"type\":\"row\",\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"type\":\"image\",\"props\":{\"image_focal_point\":\"bottom-center\",\"image_height\":550,\"image_loading\":false,\"image_svg_color\":\"emphasis\",\"image_width\":1100,\"margin\":\"default\"},\"source\":{\"query\":{\"name\":\"posts.singlePost\"},\"props\":{\"image\":{\"filters\":{\"search\":\"\"},\"name\":\"featuredImage.url\"},\"image_alt\":{\"filters\":{\"search\":\"\"},\"name\":\"title\"}}},\"name\":\"Immagine\"}]}],\"props\":{\"divider\":false,\"width\":\"small\"}},{\"type\":\"row\",\"props\":{\"divider\":false,\"layout\":\"large,expand\",\"width\":\"small\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"auto\"},\"children\":[{\"type\":\"headline\",\"props\":{\"margin\":\"remove-vertical\",\"title_color\":\"primary\",\"title_element\":\"div\",\"title_font_family\":\"tertiary\",\"title_style\":\"h1\",\"visibility\":\"m\"},\"source\":{\"query\":{\"name\":\"posts.singlePost\"},\"props\":{\"content\":{\"filters\":{\"search\":\"\",\"date\":\"d\"},\"name\":\"date\"}}},\"name\":\"Giorno\"},{\"type\":\"headline\",\"props\":{\"margin\":\"remove-vertical\",\"title_element\":\"div\",\"title_style\":\"h5\",\"visibility\":\"m\"},\"source\":{\"query\":{\"name\":\"posts.singlePost\"},\"props\":{\"content\":{\"filters\":{\"search\":\"\",\"date\":\"F\"},\"name\":\"date\"}}},\"name\":\"Mese\"},{\"type\":\"headline\",\"props\":{\"margin\":\"remove-vertical\",\"title_element\":\"div\",\"title_style\":\"h5\",\"visibility\":\"m\"},\"source\":{\"query\":{\"name\":\"posts.singlePost\"},\"props\":{\"content\":{\"filters\":{\"search\":\"\",\"date\":\"Y\"},\"name\":\"date\"}}},\"name\":\"Anno\"}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"expand\"},\"children\":[{\"type\":\"headline\",\"props\":{\"margin\":\"small\",\"title_element\":\"div\",\"title_style\":\"h4\",\"visibility\":\"hidden-m\"},\"name\":\"Data\",\"source\":{\"query\":{\"name\":\"posts.singlePost\"},\"props\":{\"content\":{\"filters\":{\"search\":\"\",\"date\":\"d F, Y\"},\"name\":\"date\"}}}},{\"type\":\"headline\",\"props\":{\"margin\":\"remove-vertical\",\"title_color\":\"primary\",\"title_element\":\"h1\"},\"name\":\"Titolo\",\"source\":{\"query\":{\"name\":\"posts.singlePost\"},\"props\":{\"content\":{\"filters\":{\"search\":\"\"},\"name\":\"title\"}}}},{\"type\":\"headline\",\"props\":{\"content\":\"The package at a glance\",\"margin\":\"medium\",\"margin_remove_bottom\":true,\"title_color\":\"emphasis\",\"title_element\":\"h1\"}},{\"type\":\"text\",\"props\":{\"column_breakpoint\":\"m\",\"content\":\"\n\n<p>On 17 July 2026, the European Commission proposed a major overhaul of the EU ETS for Phase 5 (2031\\u20132040). The reform aims to balance industrial competitiveness with the EU's 90% net emissions reduction target by 2040, while supporting electrification and investment in low-carbon technologies.<\\\/p>\\n\n\n<ul>\\n\n\n<li class=\\\"isSelectedEnd\\\"><span>Still a proposal: Parliament and Council negotiation is expected to run into 2027, and details will move<\\\/span><\\\/li>\\n\n\n<li class=\\\"isSelectedEnd\\\"><span>Paired with a target to double electrification's share of final energy demand<\\\/span><\\\/li>\\n\n\n<li><span>Framed as the foundation for the EU's 2040 target of a 90% net emissions cut<\\\/span><\\\/li>\\n<\\\/ul>\",\"css\":\"li::marker {\\n  color: #17763a;\\n}\",\"margin\":\"default\"}},{\"type\":\"grid\",\"props\":{\"content_column_breakpoint\":\"m\",\"content_margin\":\"small\",\"filter_align\":\"left\",\"filter_all\":true,\"filter_grid_breakpoint\":\"m\",\"filter_grid_width\":\"auto\",\"filter_position\":\"top\",\"filter_style\":\"tab\",\"grid_default\":\"1\",\"grid_divider\":true,\"grid_medium\":\"3\",\"icon_width\":80,\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_color\":\"emphasis\",\"item_animation\":true,\"lightbox_bg_close\":true,\"link_style\":\"default\",\"link_text\":\"Read more\",\"margin\":\"default\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_style\":\"text-meta\",\"panel_link\":false,\"panel_padding\":\"small\",\"panel_style\":\"tile-muted\",\"show_content\":true,\"show_hover_image\":false,\"show_hover_video\":true,\"show_image\":false,\"show_link\":true,\"show_meta\":false,\"show_title\":true,\"show_video\":false,\"text_align\":\"left\",\"title_align\":\"top\",\"title_decoration\":\"bullet\",\"title_element\":\"h3\",\"title_grid_breakpoint\":\"m\",\"title_grid_width\":\"2-5\",\"title_hover_style\":\"reset\"},\"children\":[{\"type\":\"grid_item\",\"props\":{\"content\":\"\n\n<p>Annual cap reduction factor\\u000b2031\\u20132035, down from 4.4%<\\\/p>\",\"title\":\"3.7%\"}},{\"type\":\"grid_item\",\"props\":{\"content\":\"\n\n<p>Free allocation extended beyond the current phase-out<\\\/p>\",\"title\":\"+4 years\"}},{\"type\":\"grid_item\",\"props\":{\"content\":\"\n\n<p>Proposed MSR intake rate\\u000b(down from 24%)<\\\/p>\",\"title\":\"12% \"}}]},{\"type\":\"headline\",\"props\":{\"content\":\"The cap slows, free allocation persists with new strings attached\",\"margin\":\"medium\",\"title_element\":\"h1\"}},{\"type\":\"fragment\",\"props\":{\"margin\":\"default\"},\"children\":[{\"type\":\"row\",\"props\":{\"divider\":false,\"layout\":\"1-2,1-2\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-2\"},\"children\":[{\"type\":\"text\",\"props\":{\"column_breakpoint\":\"m\",\"content\":\"\n\n<p>Annual cap reduction rate (linear reduction factor)<\\\/p>\",\"margin\":\"default\",\"text_style\":\"small\"}},{\"type\":\"image\",\"props\":{\"image\":\"wp-content\\\/uploads\\\/2026\\\/07\\\/Screenshot-2026-07-24-142231.png\",\"image_svg_color\":\"emphasis\",\"margin\":\"default\"}},{\"type\":\"text\",\"props\":{\"column_breakpoint\":\"m\",\"content\":\"\n\n<p><i>Compares with a current Fit-for-55 baseline of 4.3% (2024-27) then 4.4% (2028+): a materially more gradual decline that eases near-term scarcity but stretches the path to 2040.<\\\/i><\\\/p>\",\"margin\":\"default\",\"text_style\":\"small\"}}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"vertical_align\":\"middle\",\"width_medium\":\"1-2\"},\"children\":[{\"type\":\"text\",\"props\":{\"column_breakpoint\":\"m\",\"content\":\"\n\n<ul>\\n\n\n<li>Slower cap reduction could ease EUA scarcity after 2030.<\\\/li>\\n\n\n<li>Free allocation would continue until 2038, four years longer than under Fit-for-55.<\\\/li>\\n\n\n<li>Companies would need to demonstrate credible decarbonization investments to retain full allocation.<\\\/li>\\n\n\n<li>Sector benchmarks will continue to determine allocation volumes.<\\\/li>\\n<\\\/ul>\",\"css\":\"li::marker {\\n  color: #17763a;\\n}\",\"margin\":\"default\",\"maxwidth\":\"large\"}}]}]}]},{\"type\":\"fragment\",\"props\":{\"margin\":\"default\"},\"children\":[{\"type\":\"row\",\"props\":{\"column_gap\":\"large\",\"css\":\".el-element {\\n    background-color: #fafbe8;\\n    padding-top: 60px;\\n    padding-bottom: 60px;\\n}\",\"margin\":\"large\",\"margin_remove_top\":false,\"width\":\"default\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"type\":\"headline\",\"props\":{\"blend\":false,\"content\":\"\n\n<p>New flexibility mechanisms<\\\/p>\",\"margin\":\"medium\",\"margin_remove_top\":false,\"title_element\":\"h1\"}},{\"type\":\"grid\",\"props\":{\"content_column_breakpoint\":\"m\",\"filter_align\":\"left\",\"filter_all\":true,\"filter_grid_breakpoint\":\"m\",\"filter_grid_width\":\"auto\",\"filter_position\":\"top\",\"filter_style\":\"tab\",\"grid_column_align\":false,\"grid_default\":\"1\",\"grid_divider\":false,\"grid_medium\":\"1\",\"icon_width\":80,\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_color\":\"emphasis\",\"item_animation\":true,\"lightbox_bg_close\":true,\"link_style\":\"default\",\"link_text\":\"Read more\",\"margin\":\"\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_style\":\"text-meta\",\"show_content\":true,\"show_hover_image\":false,\"show_hover_video\":false,\"show_image\":false,\"show_link\":false,\"show_meta\":false,\"show_title\":true,\"show_video\":false,\"title_align\":\"top\",\"title_element\":\"h3\",\"title_grid_breakpoint\":\"m\",\"title_grid_width\":\"1-2\",\"title_hover_style\":\"reset\"},\"children\":[{\"type\":\"grid_item\",\"props\":{\"content\":\"CRCF-certified permanent removals enter the cap via a 250 million allowance increase, ramping to 48 Mt a year by 2040 (an estimated \\u20ac50bn market). Only BioCCS and DACCS qualify initially, other pathways are excluded for now. Three integration models remain under review: central public purchase, operator-led procurement and surrender, and a one-in-one-out mechanism.\\n\",\"title\":\"1. Carbon removals\"}},{\"type\":\"grid_item\",\"props\":{\"content\":\"\n\n<p>The MSR is repositioned as a standing strategic reserve rather than a mechanical valve. The automatic invalidation of allowances above the current threshold is being scrapped in favour of retaining them as a stability buffer.<\\\/p>\",\"title\":\"2. Market Stability Reserve\"}}]}]}]}]},{\"type\":\"headline\",\"props\":{\"content\":\"\\u0422he ETS ecosystem in Phase 5\",\"margin\":\"medium\",\"title_element\":\"h1\"}},{\"type\":\"accordion\",\"props\":{\"collapsible\":true,\"content_column_breakpoint\":\"m\",\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_color\":\"emphasis\",\"link_style\":\"default\",\"link_text\":\"Read more\",\"multiple\":true,\"show_image\":true,\"show_link\":true},\"children\":[{\"type\":\"accordion_item\",\"props\":{\"content\":\"\n\n<div class=\\\"uk-first-column\\\">\\n\n\n<div class=\\\"el-item uk-card uk-card-default uk-card-small uk-card-body uk-margin-remove-first-child\\\" data-id=\\\"page#0-2-1-11-0\\\">\\n\n\n<div class=\\\"el-content uk-panel uk-margin-top\\\">\\n\n\n<p>Municipal waste incineration is proposed to become a permanent part of the EU ETS from 2028. <\\\/p>\\n<\\\/div>\\n<\\\/div>\\n<\\\/div>\",\"title\":\"Scope expansion\"}},{\"type\":\"accordion_item\",\"props\":{\"content\":\"\n\n<div class=\\\"el-item uk-card uk-card-default uk-card-small uk-card-body uk-margin-remove-first-child\\\" data-id=\\\"page#0-2-1-11-1\\\">\\n\n\n<div class=\\\"el-content uk-panel uk-margin-top\\\">\\n\n\n<p>A new EU financing mechanism from 2028, directing ETS revenues towards industrial decarbonisation and carbon removals. Its first phase (2028\\u20132031) reserves 400 million EUAs for an Investment Booster paying fixed carbon premia, first-come first-served, with a share reserved for lower-income states.<\\\/p>\\n<\\\/div>\\n<\\\/div>\",\"title\":\"Industrial Decarbonisation Bank\"}},{\"type\":\"accordion_item\",\"props\":{\"content\":\"\n\n<div class=\\\"uk-grid-margin uk-first-column\\\">\\n\n\n<div class=\\\"el-item uk-card uk-card-default uk-card-small uk-card-body uk-margin-remove-first-child\\\" data-id=\\\"page#0-2-1-11-2\\\">\\n\n\n<div class=\\\"el-content uk-panel uk-margin-top\\\">\\n\n\n<p>Channelling is simplified through the Industrial Decarbonisation Fund and the Innovation Fund, with a stated aim of directing industry-linked revenue back to industry.<\\\/p>\\n<\\\/div>\\n<\\\/div>\\n<\\\/div>\",\"title\":\"Revenue use\"}},{\"type\":\"accordion_item\",\"props\":{\"content\":\"\n\n<div class=\\\"uk-grid-margin uk-first-column\\\">\\n\n\n<div class=\\\"el-item uk-card uk-card-default uk-card-small uk-card-body uk-margin-remove-first-child\\\" data-id=\\\"page#0-2-1-11-2\\\">\\n\n\n<div class=\\\"el-content uk-panel uk-margin-top\\\">\\n\n\n<p>The proposal strengthens coordination between ETS1 and ETS2 to ensure a more coherent carbon pricing framework.<\\\/p>\\n<\\\/div>\\n<\\\/div>\\n<\\\/div>\",\"title\":\"ETS1\\u2013ETS2 interaction\"}}]},{\"type\":\"headline\",\"props\":{\"content\":\"\n\n<p>What this means for you<\\\/p>\",\"margin\":\"medium\",\"title_element\":\"h1\"}},{\"type\":\"grid\",\"props\":{\"content_column_breakpoint\":\"m\",\"filter_align\":\"left\",\"filter_all\":true,\"filter_grid_breakpoint\":\"m\",\"filter_grid_width\":\"auto\",\"filter_position\":\"top\",\"filter_style\":\"tab\",\"grid_default\":\"1\",\"grid_large\":\"2\",\"grid_medium\":\"2\",\"grid_xlarge\":\"2\",\"icon_width\":80,\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_color\":\"emphasis\",\"item_animation\":true,\"lightbox_bg_close\":true,\"link_style\":\"default\",\"link_text\":\"Read more\",\"margin\":\"default\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_style\":\"text-meta\",\"panel_padding\":\"small\",\"panel_style\":\"card-default\",\"show_content\":true,\"show_hover_image\":false,\"show_hover_video\":false,\"show_image\":false,\"show_link\":false,\"show_meta\":false,\"show_title\":true,\"show_video\":false,\"title_align\":\"left\",\"title_decoration\":\"bullet\",\"title_element\":\"h3\",\"title_grid_breakpoint\":\"m\",\"title_grid_column_gap\":\"small\",\"title_grid_width\":\"1-5\",\"title_hover_style\":\"reset\",\"title_style\":\"h2\"},\"children\":[{\"type\":\"grid_item\",\"props\":{\"content\":\"\n\n<p>Free allocation isn't disappearing, conditionality is the new compliance risk to plan around.<\\\/p>\",\"title\":\"1\"}},{\"type\":\"grid_item\",\"props\":{\"content\":\"\n\n<p>Carbon removals are becoming a real compliance lever; early positioning is an advantage, not just a hedge.<\\\/p>\",\"title\":\"2\"}},{\"type\":\"grid_item\",\"props\":{\"content\":\"\n\n<p>The Industrial Decarbonisation Bank and Innovation Fund, create new opportunities to finance electrification, CCS and fuel switching.<\\\/p>\",\"title\":\"3\"}},{\"type\":\"grid_item\",\"props\":{\"content\":\"\n\n<p>If you\\u2019re covered by ETS2, watch the ETS1\\\/ETS2 coordination signal closely, it may reshape scope timing.<\\\/p>\",\"title\":\"4\"}}]},{\"type\":\"headline\",\"props\":{\"content\":\"\n\n<p>What should you do next?<\\\/p>\",\"margin\":\"medium\",\"title_element\":\"h1\"}},{\"type\":\"headline\",\"props\":{\"content\":\"\n\n<h3><b>Recommended next steps <\\\/b><\\\/h3>\",\"title_element\":\"h1\"}},{\"type\":\"grid\",\"props\":{\"content_align\":false,\"content_column_breakpoint\":\"m\",\"filter_align\":\"left\",\"filter_all\":true,\"filter_grid_breakpoint\":\"m\",\"filter_grid_width\":\"auto\",\"filter_position\":\"top\",\"filter_style\":\"tab\",\"grid_default\":\"2\",\"grid_divider\":false,\"grid_large\":\"2\",\"grid_masonry\":\"next\",\"grid_medium\":\"2\",\"grid_xlarge\":\"2\",\"icon_width\":80,\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_color\":\"emphasis\",\"item_animation\":true,\"lightbox_bg_close\":true,\"link_style\":\"default\",\"link_text\":\"Read more\",\"margin\":\"default\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_style\":\"text-meta\",\"panel_padding\":\"small\",\"panel_style\":\"card-secondary\",\"show_content\":true,\"show_hover_image\":false,\"show_hover_video\":false,\"show_image\":false,\"show_link\":false,\"show_meta\":false,\"show_title\":true,\"show_video\":false,\"title_align\":\"left\",\"title_decoration\":\"bullet\",\"title_element\":\"h3\",\"title_grid_breakpoint\":\"m\",\"title_grid_column_gap\":\"small\",\"title_grid_width\":\"1-5\",\"title_hover_style\":\"reset\",\"title_style\":\"h2\"},\"children\":[{\"type\":\"grid_item\",\"props\":{\"content\":\"\n\n<p>Map your own free allocation exposure against the proposed conditionality criteria.<\\\/p>\",\"title\":\"1\"}},{\"type\":\"grid_item\",\"props\":{\"content\":\"\n\n<p>Put removals procurement on your 2026\\u20132027 watch list if you\\u2019re in a hard-to-abate sector.<\\\/p>\",\"title\":\"2\"}},{\"type\":\"grid_item\",\"props\":{\"content\":\"\n\n<p>Screen planned electrification, CCS, fuel-switching and efficiency projects for potential support through ETS funding mechanisms.<\\\/p>\",\"title\":\"3\"}},{\"type\":\"grid_item\",\"props\":{\"content\":\"\n\n<p>Revisit your plan once Parliament and Council positions emerge.<br \\\/><br \\\/><\\\/p>\",\"title\":\"4\"}}]},{\"type\":\"divider\",\"props\":{\"divider_element\":\"hr\",\"margin\":\"medium\"}},{\"type\":\"fragment\",\"props\":{\"margin\":\"default\"},\"children\":[{\"type\":\"row\",\"children\":[{\"type\":\"column\",\"props\":{\"css\":\".uk-tile-secondary {border-radius: 15px 0 0 15px !important; background: linear-gradient(to right, rgba(23,118,58,1) 0%, rgba(148,184,33,1) 100%);}\\n\\n@media screen and (max-width: 959px) and (min-width: 280px) {\\n    .uk-tile-secondary {background: linear-gradient(to bottom, rgba(23,118,58,1) 0%, rgba(148,184,33,1) 100%); border-radius: 15px 15px 0 0 !important;}\\n}\",\"image\":\"wp-content\\\/uploads\\\/2024\\\/06\\\/cta-bckg.svg\",\"image_position\":\"center-right\",\"image_size\":\"height-1-1\",\"media_focal_point\":\"center-right\",\"media_visibility\":\"m\",\"padding\":\"small\",\"position_sticky_breakpoint\":\"m\",\"style\":\"tile-secondary\",\"vertical_align\":\"middle\",\"width_medium\":\"expand\"},\"children\":[{\"type\":\"headline\",\"props\":{\"class\":\"uk-text-white\",\"content\":\"\n\n<h3>Questions on how this affects you?<\\\/h3>\",\"margin\":\"remove-vertical\",\"text_align\":\"left\",\"text_align_breakpoint\":\"m\",\"text_align_fallback\":\"center\",\"title_color\":\"primary\",\"title_element\":\"div\",\"title_style\":\"h2\"}},{\"type\":\"text\",\"props\":{\"column_breakpoint\":\"m\",\"content\":\"\n\n<p>For support and guidance as these proposals develop, we\\u2019re here to help you plan!<\\\/p>\",\"margin\":\"default\"}}]},{\"type\":\"column\",\"props\":{\"css\":\".uk-tile-secondary {border-radius: 0 15px 15px 0 !important;}\\n\\n@media screen and (max-width: 959px) and (min-width: 280px) {\\n    .uk-tile-secondary {border-radius: 0 0 15px 15px !important;}\\n    .uk-tile-small {padding-top:0;}\\n}\",\"image_position\":\"center-center\",\"padding\":\"small\",\"position_sticky_breakpoint\":\"m\",\"preserve_color\":true,\"style\":\"tile-secondary\",\"vertical_align\":\"middle\",\"width_medium\":\"auto\"},\"children\":[{\"type\":\"button\",\"props\":{\"fullwidth\":true,\"grid_column_gap\":\"small\",\"grid_row_gap\":\"small\",\"margin\":\"default\"},\"children\":[{\"type\":\"button_item\",\"props\":{\"button_style\":\"primary\",\"content\":\"Contact us\",\"dialog_layout\":\"modal\",\"dialog_offcanvas_flip\":true,\"icon_align\":\"left\",\"link\":\"contact-us\\\/\"}}]}]}],\"props\":{\"column_gap\":\"collapse\",\"layout\":\"expand,large\",\"row_gap\":\"collapse\"}}]},{\"type\":\"fragment\",\"props\":{\"margin\":\"default\"},\"children\":[{\"type\":\"row\",\"props\":{\"margin\":\"medium\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"type\":\"divider\",\"props\":{\"divider_element\":\"hr\",\"margin\":\"remove-vertical\"}}]}]},{\"type\":\"row\",\"props\":{\"divider\":true,\"layout\":\"1-2,1-2\",\"margin\":\"medium\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-2\",\"width_small\":\"1-2\"},\"children\":[{\"type\":\"panel\",\"props\":{\"content_column_breakpoint\":\"m\",\"icon\":\"chevron-left\",\"icon_width\":\"60\",\"image_align\":\"left\",\"image_grid_breakpoint\":\"\",\"image_grid_column_gap\":\"small\",\"image_grid_row_gap\":\"small\",\"image_grid_width\":\"auto\",\"image_svg_color\":\"emphasis\",\"image_vertical_align\":true,\"link_style\":\"default\",\"link_text\":\"\",\"margin\":\"remove-vertical\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_style\":\"text-meta\",\"panel_link\":true,\"text_align\":\"left\",\"title_align\":\"top\",\"title_color\":\"primary\",\"title_element\":\"div\",\"title_grid_breakpoint\":\"m\",\"title_grid_width\":\"1-2\",\"title_hover_style\":\"reset\",\"title_style\":\"h5\"},\"source\":{\"query\":{\"name\":\"posts.singlePreviousPost\"},\"props\":{\"title\":{\"filters\":{\"search\":\"\"},\"name\":\"title\"},\"link\":{\"filters\":{\"search\":\"\"},\"name\":\"link\"}}},\"name\":\"Post precedente\"}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-2\",\"width_small\":\"1-2\"},\"children\":[{\"type\":\"panel\",\"props\":{\"content_column_breakpoint\":\"m\",\"icon\":\"chevron-right\",\"icon_width\":\"60\",\"image_align\":\"right\",\"image_grid_breakpoint\":\"\",\"image_grid_column_gap\":\"small\",\"image_grid_row_gap\":\"small\",\"image_grid_width\":\"auto\",\"image_svg_color\":\"emphasis\",\"image_vertical_align\":true,\"link_style\":\"default\",\"link_text\":\"\",\"margin\":\"remove-vertical\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_style\":\"text-meta\",\"panel_link\":true,\"text_align\":\"right\",\"title_align\":\"top\",\"title_color\":\"primary\",\"title_element\":\"div\",\"title_grid_breakpoint\":\"m\",\"title_grid_width\":\"1-2\",\"title_hover_style\":\"reset\",\"title_style\":\"h5\"},\"source\":{\"query\":{\"name\":\"posts.singleNextPost\"},\"props\":{\"title\":{\"filters\":{\"search\":\"\"},\"name\":\"title\"},\"link\":{\"filters\":{\"search\":\"\"},\"name\":\"link\"}}},\"name\":\"Post successivo\"}]}]}]}]}]}],\"name\":\"Content\"}],\"version\":\"4.5.33\"} --><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The package at a glance On 17 July 2026, the European Commission proposed a major overhaul of the EU ETS for Phase 5 (2031\u20132040). The reform aims to balance industrial competitiveness with the EU&#8217;s 90% net emissions reduction target by 2040, while supporting electrification and investment in low-carbon technologies. Still a proposal: Parliament and Council [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":35404,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[84],"tags":[],"class_list":["post-35411","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regulatory-it"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Electrification Action Plan and ETS review - NVALUE<\/title>\n<meta name=\"description\" content=\"An overview of the EU Electrification Action Plan and ETS review, covering cap reductions, free allocation, carbon removals and industrial funding.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/dev.nvalue.com\/it\/sustainability\/electrification-action-plan-and-ets-review\/\" \/>\n<meta property=\"og:locale\" content=\"it_IT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Electrification Action Plan and ETS review - NVALUE\" \/>\n<meta property=\"og:description\" content=\"An overview of the EU Electrification Action Plan and ETS review, covering cap reductions, free allocation, carbon removals and industrial funding.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/dev.nvalue.com\/sustainability\/electrification-action-plan-and-ets-review\/\" \/>\n<meta property=\"og:site_name\" content=\"NVALUE\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-27T06:00:55+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-27T11:55:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/nvalue.com\/wp-content\/uploads\/2026\/07\/2026.07.27-Electrification-Action-Plan-and-ETS-review.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1100\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"marketing.nvalue\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Scritto da\" \/>\n\t<meta name=\"twitter:data1\" content=\"marketing.nvalue\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tempo di lettura stimato\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minuti\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/sustainability\\\/electrification-action-plan-and-ets-review\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/regulatory-it\\\/electrification-action-plan-and-ets-review\\\/\"},\"author\":{\"name\":\"marketing.nvalue\",\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/#\\\/schema\\\/person\\\/ede6234574f97b97951b73517ac97ca4\"},\"headline\":\"Electrification Action Plan and ETS review\",\"datePublished\":\"2026-07-27T06:00:55+00:00\",\"dateModified\":\"2026-07-27T11:55:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/regulatory-it\\\/electrification-action-plan-and-ets-review\\\/\"},\"wordCount\":543,\"image\":{\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/sustainability\\\/electrification-action-plan-and-ets-review\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dev.nvalue.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/2026.07.27-Electrification-Action-Plan-and-ETS-review.jpg\",\"articleSection\":[\"Regulatory\"],\"inLanguage\":\"it-IT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/regulatory-it\\\/electrification-action-plan-and-ets-review\\\/\",\"url\":\"https:\\\/\\\/dev.nvalue.com\\\/sustainability\\\/electrification-action-plan-and-ets-review\\\/\",\"name\":\"Electrification Action Plan and ETS review - NVALUE\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/sustainability\\\/electrification-action-plan-and-ets-review\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/sustainability\\\/electrification-action-plan-and-ets-review\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dev.nvalue.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/2026.07.27-Electrification-Action-Plan-and-ETS-review.jpg\",\"datePublished\":\"2026-07-27T06:00:55+00:00\",\"dateModified\":\"2026-07-27T11:55:59+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/#\\\/schema\\\/person\\\/ede6234574f97b97951b73517ac97ca4\"},\"description\":\"An overview of the EU Electrification Action Plan and ETS review, covering cap reductions, free allocation, carbon removals and industrial funding.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/sustainability\\\/electrification-action-plan-and-ets-review\\\/#breadcrumb\"},\"inLanguage\":\"it-IT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/dev.nvalue.com\\\/sustainability\\\/electrification-action-plan-and-ets-review\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"it-IT\",\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/sustainability\\\/electrification-action-plan-and-ets-review\\\/#primaryimage\",\"url\":\"https:\\\/\\\/dev.nvalue.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/2026.07.27-Electrification-Action-Plan-and-ETS-review.jpg\",\"contentUrl\":\"https:\\\/\\\/dev.nvalue.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/2026.07.27-Electrification-Action-Plan-and-ETS-review.jpg\",\"width\":1100,\"height\":600,\"caption\":\"Electrification Action Plan and ETS review\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/sustainability\\\/electrification-action-plan-and-ets-review\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Electrification Action Plan and ETS review\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/#website\",\"url\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/\",\"name\":\"NVALUE\",\"description\":\"Certificati Energia Rinnovabile\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"it-IT\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/#\\\/schema\\\/person\\\/ede6234574f97b97951b73517ac97ca4\",\"name\":\"marketing.nvalue\",\"url\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/author\\\/marketing-nvalue\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Electrification Action Plan and ETS review - NVALUE","description":"An overview of the EU Electrification Action Plan and ETS review, covering cap reductions, free allocation, carbon removals and industrial funding.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/dev.nvalue.com\/it\/sustainability\/electrification-action-plan-and-ets-review\/","og_locale":"it_IT","og_type":"article","og_title":"Electrification Action Plan and ETS review - NVALUE","og_description":"An overview of the EU Electrification Action Plan and ETS review, covering cap reductions, free allocation, carbon removals and industrial funding.","og_url":"https:\/\/dev.nvalue.com\/sustainability\/electrification-action-plan-and-ets-review\/","og_site_name":"NVALUE","article_published_time":"2026-07-27T06:00:55+00:00","article_modified_time":"2026-07-27T11:55:59+00:00","og_image":[{"width":1100,"height":600,"url":"https:\/\/nvalue.com\/wp-content\/uploads\/2026\/07\/2026.07.27-Electrification-Action-Plan-and-ETS-review.jpg","type":"image\/jpeg"}],"author":"marketing.nvalue","twitter_card":"summary_large_image","twitter_misc":{"Scritto da":"marketing.nvalue","Tempo di lettura stimato":"3 minuti"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/dev.nvalue.com\/sustainability\/electrification-action-plan-and-ets-review\/#article","isPartOf":{"@id":"https:\/\/dev.nvalue.com\/it\/regulatory-it\/electrification-action-plan-and-ets-review\/"},"author":{"name":"marketing.nvalue","@id":"https:\/\/dev.nvalue.com\/it\/#\/schema\/person\/ede6234574f97b97951b73517ac97ca4"},"headline":"Electrification Action Plan and ETS review","datePublished":"2026-07-27T06:00:55+00:00","dateModified":"2026-07-27T11:55:59+00:00","mainEntityOfPage":{"@id":"https:\/\/dev.nvalue.com\/it\/regulatory-it\/electrification-action-plan-and-ets-review\/"},"wordCount":543,"image":{"@id":"https:\/\/dev.nvalue.com\/sustainability\/electrification-action-plan-and-ets-review\/#primaryimage"},"thumbnailUrl":"https:\/\/dev.nvalue.com\/wp-content\/uploads\/2026\/07\/2026.07.27-Electrification-Action-Plan-and-ETS-review.jpg","articleSection":["Regulatory"],"inLanguage":"it-IT"},{"@type":"WebPage","@id":"https:\/\/dev.nvalue.com\/it\/regulatory-it\/electrification-action-plan-and-ets-review\/","url":"https:\/\/dev.nvalue.com\/sustainability\/electrification-action-plan-and-ets-review\/","name":"Electrification Action Plan and ETS review - NVALUE","isPartOf":{"@id":"https:\/\/dev.nvalue.com\/it\/#website"},"primaryImageOfPage":{"@id":"https:\/\/dev.nvalue.com\/sustainability\/electrification-action-plan-and-ets-review\/#primaryimage"},"image":{"@id":"https:\/\/dev.nvalue.com\/sustainability\/electrification-action-plan-and-ets-review\/#primaryimage"},"thumbnailUrl":"https:\/\/dev.nvalue.com\/wp-content\/uploads\/2026\/07\/2026.07.27-Electrification-Action-Plan-and-ETS-review.jpg","datePublished":"2026-07-27T06:00:55+00:00","dateModified":"2026-07-27T11:55:59+00:00","author":{"@id":"https:\/\/dev.nvalue.com\/it\/#\/schema\/person\/ede6234574f97b97951b73517ac97ca4"},"description":"An overview of the EU Electrification Action Plan and ETS review, covering cap reductions, free allocation, carbon removals and industrial funding.","breadcrumb":{"@id":"https:\/\/dev.nvalue.com\/sustainability\/electrification-action-plan-and-ets-review\/#breadcrumb"},"inLanguage":"it-IT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/dev.nvalue.com\/sustainability\/electrification-action-plan-and-ets-review\/"]}]},{"@type":"ImageObject","inLanguage":"it-IT","@id":"https:\/\/dev.nvalue.com\/sustainability\/electrification-action-plan-and-ets-review\/#primaryimage","url":"https:\/\/dev.nvalue.com\/wp-content\/uploads\/2026\/07\/2026.07.27-Electrification-Action-Plan-and-ETS-review.jpg","contentUrl":"https:\/\/dev.nvalue.com\/wp-content\/uploads\/2026\/07\/2026.07.27-Electrification-Action-Plan-and-ETS-review.jpg","width":1100,"height":600,"caption":"Electrification Action Plan and ETS review"},{"@type":"BreadcrumbList","@id":"https:\/\/dev.nvalue.com\/sustainability\/electrification-action-plan-and-ets-review\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/dev.nvalue.com\/it\/"},{"@type":"ListItem","position":2,"name":"Electrification Action Plan and ETS review"}]},{"@type":"WebSite","@id":"https:\/\/dev.nvalue.com\/it\/#website","url":"https:\/\/dev.nvalue.com\/it\/","name":"NVALUE","description":"Certificati Energia Rinnovabile","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/dev.nvalue.com\/it\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"it-IT"},{"@type":"Person","@id":"https:\/\/dev.nvalue.com\/it\/#\/schema\/person\/ede6234574f97b97951b73517ac97ca4","name":"marketing.nvalue","url":"https:\/\/dev.nvalue.com\/it\/author\/marketing-nvalue\/"}]}},"_links":{"self":[{"href":"https:\/\/dev.nvalue.com\/it\/wp-json\/wp\/v2\/posts\/35411","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dev.nvalue.com\/it\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dev.nvalue.com\/it\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dev.nvalue.com\/it\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/dev.nvalue.com\/it\/wp-json\/wp\/v2\/comments?post=35411"}],"version-history":[{"count":0,"href":"https:\/\/dev.nvalue.com\/it\/wp-json\/wp\/v2\/posts\/35411\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dev.nvalue.com\/it\/wp-json\/wp\/v2\/media\/35404"}],"wp:attachment":[{"href":"https:\/\/dev.nvalue.com\/it\/wp-json\/wp\/v2\/media?parent=35411"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dev.nvalue.com\/it\/wp-json\/wp\/v2\/categories?post=35411"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dev.nvalue.com\/it\/wp-json\/wp\/v2\/tags?post=35411"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}