{"id":31683,"date":"2025-06-16T10:38:35","date_gmt":"2025-06-16T08:38:35","guid":{"rendered":"https:\/\/dev.nvalue.com\/sustainability-it\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\/"},"modified":"2025-07-30T11:41:13","modified_gmt":"2025-07-30T09:41:13","slug":"nvalues-position-regarding-the-scope-2-technical-working-group-progress-update","status":"publish","type":"post","link":"https:\/\/dev.nvalue.com\/it\/market-news-it\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\/","title":{"rendered":"Nvalue\u2019s position regarding the Scope 2 Technical Working Group Progress Update"},"content":{"rendered":"<div>\n<p><span data-contrast=\"auto\">We read with interest the <\/span><b><span data-contrast=\"auto\">update published by the GHGP<\/span><\/b><span data-contrast=\"auto\"> on the 11th of June 2025 regarding the <\/span><a href=\"https:\/\/ghgprotocol.org\/blog\/scope-2-technical-working-group-progress-update\" target=\"_blank\" rel=\"noopener\"><b><span data-contrast=\"auto\">progress of the Scope 2 standards revision<\/span><\/b><\/a><span data-contrast=\"auto\">. We&#8217;d like to offer some <\/span><b><span data-contrast=\"auto\">points for consideration<\/span><\/b><span data-contrast=\"auto\"> concerning the following paragraphs.\u00a0<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<blockquote>\n<p><i><span data-contrast=\"auto\">\u201cFor example, consider a company that purchases enough renewable energy certificates (RECs) from a solar project in a different region, one not connected to the electricity grid where the company operates, to match all its annual electricity use. Under the current\u202fScope 2 Guidance,\u202fthis company could report that it is powered 100% by renewable energy from that solar project. But this can misrepresent how and where electricity is actually used. Electricity must be produced and consumed at the same time and within the same grid system, unless storage is involved. So, if a company uses electricity at night in one region, it cannot plausibly be using solar power generated during the day in another, unconnected region. This mismatch in time and place weakens the accuracy and credibility of reported emissions data and makes it harder to compare inventories across organizations.<\/span><\/i><i><span data-contrast=\"auto\">\u202f\u201c [&#8230;]<\/span><\/i><span data-ccp-props=\"{&quot;335559685&quot;:851,&quot;335559737&quot;:1938}\">\u00a0<\/span><\/p>\n<p><i><span data-contrast=\"auto\">\u201cThis new impact-based metric,\u202fMarginal Emissions Impact,\u202fis designed to reflect how much a clean energy purchase displaces fossil fuel emissions on the grid. For example, imagine a company in one part of Europe purchasing solar energy from another region within the continent. Under current practices, that company may be able to count the purchase toward its scope 2 inventory even if the electricity isn\u2019t used at the same time or isn\u2019t deliverable to their facilities. Under the proposed revisions, that purchase would no longer count toward their scope 2 emissions total because it doesn&#8217;t match when or where the electricity is used.\u201c<\/span><\/i><span data-ccp-props=\"{&quot;335559685&quot;:851,&quot;335559737&quot;:1938}\"> <\/span><\/p>\n<\/blockquote>\n<h2>1. On the Credibility and Functioning of the REC System<span data-ccp-props=\"{}\"><\/span><\/h2>\n<p><span data-contrast=\"auto\">We agree that for the credibility of the Renewable Energy Certificate (REC) system, the point of electricity injection and withdrawal must be interconnected and part of the same electrical grid. However, demanding that electricity be produced and consumed simultaneously is, in our opinion, an <\/span><b><span data-contrast=\"auto\">incorrect interpretation of how the electricity market functions<\/span><\/b><span data-contrast=\"auto\">. The electricity grid requires a constant balance between supply and demand; without it, blackouts would occur. Once electricity enters the grid, it cannot be controlled or individually traced to its origin. Therefore, unless an industry is physically located between a renewable power plant and the electric grid, <\/span><b><span data-contrast=\"auto\">it is currently impossible to ascertain which power plant an industry is consuming electricity from<\/span><\/b><span data-contrast=\"auto\"> at any given moment. For this reason, Guarantees of Origin (GOs) currently certify virtuous consumption behaviour, even if the underlying electricity is likely consumed by another market participant. If electricity is injected and withdrawn from the same interconnected grid (as in the European Union), <\/span><b><span data-contrast=\"auto\">the current book-and-claim GO system already allows for free choice<\/span><\/b><span data-contrast=\"auto\"> as the electronic certificates carries the information needed to express that choice: whether to account for consumption annually or more granularly by choosing full off-takes from renewable plants, or by purchasing monthly, weekly, or even daily profiles of GOs.<\/span><span data-ccp-props=\"{}\"> <\/span><\/p>\n<h2>2. The Challenges of Mandatory Hourly Matching<\/h2>\n<p><span data-contrast=\"auto\">Forcing hourly matching could severely <\/span><b><span data-contrast=\"auto\">compromise<\/span><\/b><span data-contrast=\"auto\"> some companies&#8217; ability to maintain their commitments to <\/span><b><span data-contrast=\"auto\">renewable electricity consumption<\/span><\/b><span data-contrast=\"auto\">. This is primarily due to two critical aspects:<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<ol>\n<li><span data-contrast=\"auto\"> <\/span><b><span data-contrast=\"auto\">Price Volatility and Scarcity:<\/span><\/b><span data-contrast=\"auto\"> Certain hours will record extremely high prices or see zero availability of EACs due to scarcity, resulting in market dynamics that would excessively and unreasonably remunerate the holders of those EACs, who are not necessarily the producers. <\/span><b><span data-contrast=\"auto\">Speculative dynamics would be triggered<\/span><\/b><span data-contrast=\"auto\">, that would risk <\/span><b><span data-contrast=\"auto\">damaging the credibility of the system<\/span><\/b><span data-contrast=\"auto\"> and the will of consumers.\n<p><\/span><\/li>\n<li><span data-ccp-props=\"{}\"><\/span><b><span data-contrast=\"auto\">Infrastructural Complexity:<\/span><\/b><span data-contrast=\"auto\"> to date there are still many who use excel to count electricity consumption and even to manage the electricity labelling. Hourly matching would bring the degree of <\/span><b><span data-contrast=\"auto\">complexity<\/span><\/b><span data-contrast=\"auto\"> to be managed to such a level as to require an investment in expensive CTRM systems, <\/span><b><span data-contrast=\"auto\">often provided by external service providers<\/span><\/b><span data-contrast=\"auto\">, thus adding the risk of depending on an external entity.<\/span><span data-ccp-props=\"{}\"><\/span><\/li>\n<\/ol>\n<p><span data-contrast=\"auto\">To illustrate these points, consider a large group of companies within the same sector with similar daily consumption profiles, all aiming for hourly renewable electricity consumption. If the renewable capacity in that country is limited during those specific hours, these companies would face prohibitively high procurement costs, contrasting sharply with lower costs for similar companies in a country with higher hourly renewable capacity; thus harming their competitiveness and taking away from them the instruments to play even. Furthermore, some companies may have invested in PV plants to hedge their electricity procurement costs. However, if their consumption profile does not match their plant&#8217;s production profile, these companies would be unable to optimize their procurement costs with adequate income from their photovoltaic plant.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">These examples are not exhaustive and are somewhat simplified, but their purpose is to explain that certain market dynamics might not have been adequately considered. <\/span><b><span data-contrast=\"auto\">Imposing an hourly matching obligation could lead to unintended consequences<\/span><\/b><span data-contrast=\"auto\">, potentially disincentivizing renewable electricity consumption in favour of, for example, nuclear power.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">In our opinion, a much more pressing and easier-to-implement aspect would be the introduction of an <\/span><b><span data-contrast=\"auto\">annual matching obligation<\/span><\/b><span data-contrast=\"auto\">, both at the level of the GHGP and the relevant European Directive. This would ensure that <\/span><b><span data-contrast=\"auto\">the rules of the game are consistent<\/span><\/b><span data-contrast=\"auto\"> for both electricity labelling dynamics and the voluntary procurement of EACs.<\/span><\/p>\n<\/div>\n<hr>\n<p><p>\n        <a href=\"https:\/\/dev.nvalue.com\/it\/contatti\/\">Contact us<\/a>\n    <\/p>\n<\/p>\n<hr>\n<p><!--more--><br \/>\n<!-- {\"type\":\"layout\",\"children\":[{\"type\":\"section\",\"props\":{\"image_position\":\"center-center\",\"style\":\"default\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"\",\"width\":\"default\"},\"children\":[{\"type\":\"row\",\"props\":{\"width\":\"small\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"type\":\"breadcrumbs\",\"props\":{\"margin\":\"default\",\"show_current\":true,\"show_home\":true}}]}]},{\"type\":\"row\",\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"type\":\"image\",\"props\":{\"image_focal_point\":\"bottom-center\",\"image_height\":550,\"image_loading\":false,\"image_svg_color\":\"emphasis\",\"image_width\":1100,\"margin\":\"default\"},\"source\":{\"query\":{\"name\":\"posts.singlePost\"},\"props\":{\"image\":{\"filters\":{\"search\":\"\"},\"name\":\"featuredImage.url\"},\"image_alt\":{\"filters\":{\"search\":\"\"},\"name\":\"title\"}}},\"name\":\"Immagine\"}]}],\"props\":{\"divider\":false,\"width\":\"small\"}},{\"type\":\"row\",\"props\":{\"divider\":false,\"layout\":\"large,expand\",\"width\":\"small\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"auto\"},\"children\":[{\"type\":\"headline\",\"props\":{\"margin\":\"remove-vertical\",\"title_color\":\"primary\",\"title_element\":\"div\",\"title_font_family\":\"tertiary\",\"title_style\":\"h1\",\"visibility\":\"m\"},\"source\":{\"query\":{\"name\":\"posts.singlePost\"},\"props\":{\"content\":{\"filters\":{\"search\":\"\",\"date\":\"d\"},\"name\":\"date\"}}},\"name\":\"Giorno\"},{\"type\":\"headline\",\"props\":{\"margin\":\"remove-vertical\",\"title_element\":\"div\",\"title_style\":\"h5\",\"visibility\":\"m\"},\"source\":{\"query\":{\"name\":\"posts.singlePost\"},\"props\":{\"content\":{\"filters\":{\"search\":\"\",\"date\":\"F\"},\"name\":\"date\"}}},\"name\":\"Mese\"},{\"type\":\"headline\",\"props\":{\"margin\":\"remove-vertical\",\"title_element\":\"div\",\"title_style\":\"h5\",\"visibility\":\"m\"},\"source\":{\"query\":{\"name\":\"posts.singlePost\"},\"props\":{\"content\":{\"filters\":{\"search\":\"\",\"date\":\"Y\"},\"name\":\"date\"}}},\"name\":\"Anno\"}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"expand\"},\"children\":[{\"type\":\"headline\",\"props\":{\"margin\":\"small\",\"title_element\":\"div\",\"title_style\":\"h4\",\"visibility\":\"hidden-m\"},\"name\":\"Data\",\"source\":{\"query\":{\"name\":\"posts.singlePost\"},\"props\":{\"content\":{\"filters\":{\"search\":\"\",\"date\":\"d F, Y\"},\"name\":\"date\"}}}},{\"type\":\"headline\",\"props\":{\"margin\":\"remove-vertical\",\"title_color\":\"primary\",\"title_element\":\"h1\"},\"name\":\"Titolo\",\"source\":{\"query\":{\"name\":\"posts.singlePost\"},\"props\":{\"content\":{\"filters\":{\"search\":\"\"},\"name\":\"title\"}}}},{\"type\":\"text\",\"props\":{\"column_breakpoint\":\"m\",\"content\":\"\n\n<p><span data-contrast=\\\"auto\\\">We read with interest the <\\\/span><b><span data-contrast=\\\"auto\\\">update published by the GHGP<\\\/span><\\\/b><span data-contrast=\\\"auto\\\"> on the 11th of June 2025 regarding the <\\\/span><a href=\\\"https:\\\/\\\/ghgprotocol.org\\\/blog\\\/scope-2-technical-working-group-progress-update\\\" target=\\\"_blank\\\" rel=\\\"noopener\\\"><b><span data-contrast=\\\"auto\\\">progress of the Scope 2 standards revision<\\\/span><\\\/b><\\\/a><span data-contrast=\\\"auto\\\">. We'd like to offer some <\\\/span><b><span data-contrast=\\\"auto\\\">points for consideration<\\\/span><\\\/b><span data-contrast=\\\"auto\\\"> concerning the following paragraphs.\\u00a0<\\\/span><span data-ccp-props=\\\"{}\\\">\\u00a0<\\\/span><\\\/p>\\n\n\n<blockquote>\\n\n\n<p><i><span data-contrast=\\\"auto\\\">\\u201cFor example, consider a company that purchases enough renewable energy certificates (RECs) from a solar project in a different region, one not connected to the electricity grid where the company operates, to match all its annual electricity use. Under the current\\u202fScope 2 Guidance,\\u202fthis company could report that it is powered 100% by renewable energy from that solar project. But this can misrepresent how and where electricity is actually used. Electricity must be produced and consumed at the same time and within the same grid system, unless storage is involved. So, if a company uses electricity at night in one region, it cannot plausibly be using solar power generated during the day in another, unconnected region. This mismatch in time and place weakens the accuracy and credibility of reported emissions data and makes it harder to compare inventories across organizations.<\\\/span><\\\/i><i><span data-contrast=\\\"auto\\\">\\u202f\\u201c [...]<\\\/span><\\\/i><span data-ccp-props=\\\"{&quot;335559685&quot;:851,&quot;335559737&quot;:1938}\\\">\\u00a0<\\\/span><\\\/p>\\n\n\n<p><i><span data-contrast=\\\"auto\\\">\\u201cThis new impact-based metric,\\u202fMarginal Emissions Impact,\\u202fis designed to reflect how much a clean energy purchase displaces fossil fuel emissions on the grid. For example, imagine a company in one part of Europe purchasing solar energy from another region within the continent. Under current practices, that company may be able to count the purchase toward its scope 2 inventory even if the electricity isn\\u2019t used at the same time or isn\\u2019t deliverable to their facilities. Under the proposed revisions, that purchase would no longer count toward their scope 2 emissions total because it doesn't match when or where the electricity is used.\\u201c<\\\/span><\\\/i><span data-ccp-props=\\\"{&quot;335559685&quot;:851,&quot;335559737&quot;:1938}\\\"> <\\\/span><\\\/p>\\n<\\\/blockquote>\\n\n\n<h2>1. On the Credibility and Functioning of the REC System<span data-ccp-props=\\\"{}\\\"><\\\/span><\\\/h2>\\n\n\n<p><span data-contrast=\\\"auto\\\">We agree that for the credibility of the Renewable Energy Certificate (REC) system, the point of electricity injection and withdrawal must be interconnected and part of the same electrical grid. However, demanding that electricity be produced and consumed simultaneously is, in our opinion, an <\\\/span><b><span data-contrast=\\\"auto\\\">incorrect interpretation of how the electricity market functions<\\\/span><\\\/b><span data-contrast=\\\"auto\\\">. The electricity grid requires a constant balance between supply and demand; without it, blackouts would occur. Once electricity enters the grid, it cannot be controlled or individually traced to its origin. Therefore, unless an industry is physically located between a renewable power plant and the electric grid, <\\\/span><b><span data-contrast=\\\"auto\\\">it is currently impossible to ascertain which power plant an industry is consuming electricity from<\\\/span><\\\/b><span data-contrast=\\\"auto\\\"> at any given moment. For this reason, Guarantees of Origin (GOs) currently certify virtuous consumption behaviour, even if the underlying electricity is likely consumed by another market participant. If electricity is injected and withdrawn from the same interconnected grid (as in the European Union), <\\\/span><b><span data-contrast=\\\"auto\\\">the current book-and-claim GO system already allows for free choice<\\\/span><\\\/b><span data-contrast=\\\"auto\\\"> as the electronic certificates carries the information needed to express that choice: whether to account for consumption annually or more granularly by choosing full off-takes from renewable plants, or by purchasing monthly, weekly, or even daily profiles of GOs.<\\\/span><span data-ccp-props=\\\"{}\\\"> <\\\/span><\\\/p>\\n\n\n<h2>2. The Challenges of Mandatory Hourly Matching<\\\/h2>\\n\n\n<p><span data-contrast=\\\"auto\\\">Forcing hourly matching could severely <\\\/span><b><span data-contrast=\\\"auto\\\">compromise<\\\/span><\\\/b><span data-contrast=\\\"auto\\\"> some companies' ability to maintain their commitments to <\\\/span><b><span data-contrast=\\\"auto\\\">renewable electricity consumption<\\\/span><\\\/b><span data-contrast=\\\"auto\\\">. This is primarily due to two critical aspects:<\\\/span><span data-ccp-props=\\\"{}\\\">\\u00a0<\\\/span><\\\/p>\\n\n\n<ol>\\n\n\n<li><span data-contrast=\\\"auto\\\"> <\\\/span><b><span data-contrast=\\\"auto\\\">Price Volatility and Scarcity:<\\\/span><\\\/b><span data-contrast=\\\"auto\\\"> Certain hours will record extremely high prices or see zero availability of EACs due to scarcity, resulting in market dynamics that would excessively and unreasonably remunerate the holders of those EACs, who are not necessarily the producers. <\\\/span><b><span data-contrast=\\\"auto\\\">Speculative dynamics would be triggered<\\\/span><\\\/b><span data-contrast=\\\"auto\\\">, that would risk <\\\/span><b><span data-contrast=\\\"auto\\\">damaging the credibility of the system<\\\/span><\\\/b><span data-contrast=\\\"auto\\\"> and the will of consumers.<br \\\/><br \\\/><\\\/span><\\\/li>\\n\n\n<li><span data-ccp-props=\\\"{}\\\"><\\\/span><b><span data-contrast=\\\"auto\\\">Infrastructural Complexity:<\\\/span><\\\/b><span data-contrast=\\\"auto\\\"> to date there are still many who use excel to count electricity consumption and even to manage the electricity labelling. Hourly matching would bring the degree of <\\\/span><b><span data-contrast=\\\"auto\\\">complexity<\\\/span><\\\/b><span data-contrast=\\\"auto\\\"> to be managed to such a level as to require an investment in expensive CTRM systems, <\\\/span><b><span data-contrast=\\\"auto\\\">often provided by external service providers<\\\/span><\\\/b><span data-contrast=\\\"auto\\\">, thus adding the risk of depending on an external entity.<\\\/span><span data-ccp-props=\\\"{}\\\"><\\\/span><\\\/li>\\n<\\\/ol>\\n\n\n<p><span data-contrast=\\\"auto\\\">To illustrate these points, consider a large group of companies within the same sector with similar daily consumption profiles, all aiming for hourly renewable electricity consumption. If the renewable capacity in that country is limited during those specific hours, these companies would face prohibitively high procurement costs, contrasting sharply with lower costs for similar companies in a country with higher hourly renewable capacity; thus harming their competitiveness and taking away from them the instruments to play even. Furthermore, some companies may have invested in PV plants to hedge their electricity procurement costs. However, if their consumption profile does not match their plant's production profile, these companies would be unable to optimize their procurement costs with adequate income from their photovoltaic plant.<\\\/span><span data-ccp-props=\\\"{}\\\">\\u00a0<\\\/span><\\\/p>\\n\n\n<p><span data-contrast=\\\"auto\\\">These examples are not exhaustive and are somewhat simplified, but their purpose is to explain that certain market dynamics might not have been adequately considered. <\\\/span><b><span data-contrast=\\\"auto\\\">Imposing an hourly matching obligation could lead to unintended consequences<\\\/span><\\\/b><span data-contrast=\\\"auto\\\">, potentially disincentivizing renewable electricity consumption in favour of, for example, nuclear power.<\\\/span><span data-ccp-props=\\\"{}\\\">\\u00a0<\\\/span><\\\/p>\\n\n\n<p><span data-contrast=\\\"auto\\\">In our opinion, a much more pressing and easier-to-implement aspect would be the introduction of an <\\\/span><b><span data-contrast=\\\"auto\\\">annual matching obligation<\\\/span><\\\/b><span data-contrast=\\\"auto\\\">, both at the level of the GHGP and the relevant European Directive. This would ensure that <\\\/span><b><span data-contrast=\\\"auto\\\">the rules of the game are consistent<\\\/span><\\\/b><span data-contrast=\\\"auto\\\"> for both electricity labelling dynamics and the voluntary procurement of EACs.<\\\/span><\\\/p>\",\"margin\":\"default\"}},{\"type\":\"divider\",\"props\":{\"divider_element\":\"hr\"}},{\"type\":\"button\",\"props\":{\"button_size\":\"large\",\"fullwidth\":true,\"grid_column_gap\":\"medium\",\"grid_row_gap\":\"medium\",\"margin\":\"medium\"},\"children\":[{\"type\":\"button_item\",\"props\":{\"button_style\":\"primary\",\"content\":\"Contact us\",\"dialog_layout\":\"modal\",\"dialog_offcanvas_flip\":true,\"icon_align\":\"left\",\"link\":\"https:\\\/\\\/nvalue.com\\\/contact-us\\\/\",\"link_target\":\"blank\"}}]},{\"type\":\"fragment\",\"props\":{\"margin\":\"default\"},\"children\":[{\"type\":\"row\",\"props\":{\"margin\":\"medium\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"type\":\"divider\",\"props\":{\"divider_element\":\"hr\",\"margin\":\"remove-vertical\"}}]}]},{\"type\":\"row\",\"props\":{\"divider\":true,\"layout\":\"1-2,1-2\",\"margin\":\"medium\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-2\",\"width_small\":\"1-2\"},\"children\":[{\"type\":\"panel\",\"props\":{\"content_column_breakpoint\":\"m\",\"icon\":\"chevron-left\",\"icon_width\":\"60\",\"image_align\":\"left\",\"image_grid_breakpoint\":\"\",\"image_grid_column_gap\":\"small\",\"image_grid_row_gap\":\"small\",\"image_grid_width\":\"auto\",\"image_svg_color\":\"emphasis\",\"image_vertical_align\":true,\"link_style\":\"default\",\"link_text\":\"\",\"margin\":\"remove-vertical\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_style\":\"text-meta\",\"panel_link\":true,\"text_align\":\"left\",\"title_align\":\"top\",\"title_color\":\"primary\",\"title_element\":\"div\",\"title_grid_breakpoint\":\"m\",\"title_grid_width\":\"1-2\",\"title_hover_style\":\"reset\",\"title_style\":\"h5\"},\"source\":{\"query\":{\"name\":\"posts.singlePreviousPost\"},\"props\":{\"title\":{\"filters\":{\"search\":\"\"},\"name\":\"title\"},\"link\":{\"filters\":{\"search\":\"\"},\"name\":\"link\"}}},\"name\":\"Post precedente\"}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-2\",\"width_small\":\"1-2\"},\"children\":[{\"type\":\"panel\",\"props\":{\"content_column_breakpoint\":\"m\",\"icon\":\"chevron-right\",\"icon_width\":\"60\",\"image_align\":\"right\",\"image_grid_breakpoint\":\"\",\"image_grid_column_gap\":\"small\",\"image_grid_row_gap\":\"small\",\"image_grid_width\":\"auto\",\"image_svg_color\":\"emphasis\",\"image_vertical_align\":true,\"link_style\":\"default\",\"link_text\":\"\",\"margin\":\"remove-vertical\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_style\":\"text-meta\",\"panel_link\":true,\"text_align\":\"right\",\"title_align\":\"top\",\"title_color\":\"primary\",\"title_element\":\"div\",\"title_grid_breakpoint\":\"m\",\"title_grid_width\":\"1-2\",\"title_hover_style\":\"reset\",\"title_style\":\"h5\"},\"source\":{\"query\":{\"name\":\"posts.singleNextPost\"},\"props\":{\"title\":{\"filters\":{\"search\":\"\"},\"name\":\"title\"},\"link\":{\"filters\":{\"search\":\"\"},\"name\":\"link\"}}},\"name\":\"Post successivo\"}]}]}]}]}]}],\"name\":\"Content\"}],\"version\":\"4.5.24\"} --><\/p>\n","protected":false},"excerpt":{"rendered":"<p>We read with interest the update published by the GHGP on the 11th of June 2025 regarding the progress of the Scope 2 standards revision. We&#8217;d like to offer some points for consideration concerning the following paragraphs.\u00a0\u00a0 \u201cFor example, consider a company that purchases enough renewable energy certificates (RECs) from a solar project in a [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":31675,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[78],"tags":[],"class_list":["post-31683","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-market-news-it"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Nvalue\u2019s position regarding the Scope 2 Technical Working Group Progress Update - NVALUE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/dev.nvalue.com\/it\/market-news-it\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\/\" \/>\n<meta property=\"og:locale\" content=\"it_IT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nvalue\u2019s position regarding the Scope 2 Technical Working Group Progress Update - NVALUE\" \/>\n<meta property=\"og:description\" content=\"We read with interest the update published by the GHGP on the 11th of June 2025 regarding the progress of the Scope 2 standards revision. We&#8217;d like to offer some points for consideration concerning the following paragraphs.\u00a0\u00a0 \u201cFor example, consider a company that purchases enough renewable energy certificates (RECs) from a solar project in a [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/dev.nvalue.com\/it\/market-news-it\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\/\" \/>\n<meta property=\"og:site_name\" content=\"NVALUE\" \/>\n<meta property=\"article:published_time\" content=\"2025-06-16T08:38:35+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-07-30T09:41:13+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/dev.nvalue.com\/wp-content\/uploads\/2025\/06\/shutterstock_2483865553_r_c.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1100\" \/>\n\t<meta property=\"og:image:height\" content=\"687\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"marketing.nvalue\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Scritto da\" \/>\n\t<meta name=\"twitter:data1\" content=\"marketing.nvalue\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tempo di lettura stimato\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minuti\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/market-news-it\\\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/market-news-it\\\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\\\/\"},\"author\":{\"name\":\"marketing.nvalue\",\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/#\\\/schema\\\/person\\\/ede6234574f97b97951b73517ac97ca4\"},\"headline\":\"Nvalue\u2019s position regarding the Scope 2 Technical Working Group Progress Update\",\"datePublished\":\"2025-06-16T08:38:35+00:00\",\"dateModified\":\"2025-07-30T09:41:13+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/market-news-it\\\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\\\/\"},\"wordCount\":883,\"image\":{\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/market-news-it\\\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dev.nvalue.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/shutterstock_2483865553_r_c.jpg\",\"articleSection\":[\"Market news\"],\"inLanguage\":\"it-IT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/market-news-it\\\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\\\/\",\"url\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/market-news-it\\\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\\\/\",\"name\":\"Nvalue\u2019s position regarding the Scope 2 Technical Working Group Progress Update - NVALUE\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/market-news-it\\\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/market-news-it\\\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dev.nvalue.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/shutterstock_2483865553_r_c.jpg\",\"datePublished\":\"2025-06-16T08:38:35+00:00\",\"dateModified\":\"2025-07-30T09:41:13+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/#\\\/schema\\\/person\\\/ede6234574f97b97951b73517ac97ca4\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/market-news-it\\\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\\\/#breadcrumb\"},\"inLanguage\":\"it-IT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/market-news-it\\\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"it-IT\",\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/market-news-it\\\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\\\/#primaryimage\",\"url\":\"https:\\\/\\\/dev.nvalue.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/shutterstock_2483865553_r_c.jpg\",\"contentUrl\":\"https:\\\/\\\/dev.nvalue.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/shutterstock_2483865553_r_c.jpg\",\"width\":1100,\"height\":687},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/market-news-it\\\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nvalue\u2019s position regarding the Scope 2 Technical Working Group Progress Update\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/#website\",\"url\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/\",\"name\":\"NVALUE\",\"description\":\"Certificati Energia Rinnovabile\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"it-IT\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/#\\\/schema\\\/person\\\/ede6234574f97b97951b73517ac97ca4\",\"name\":\"marketing.nvalue\",\"url\":\"https:\\\/\\\/dev.nvalue.com\\\/it\\\/author\\\/marketing-nvalue\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Nvalue\u2019s position regarding the Scope 2 Technical Working Group Progress Update - NVALUE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/dev.nvalue.com\/it\/market-news-it\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\/","og_locale":"it_IT","og_type":"article","og_title":"Nvalue\u2019s position regarding the Scope 2 Technical Working Group Progress Update - NVALUE","og_description":"We read with interest the update published by the GHGP on the 11th of June 2025 regarding the progress of the Scope 2 standards revision. We&#8217;d like to offer some points for consideration concerning the following paragraphs.\u00a0\u00a0 \u201cFor example, consider a company that purchases enough renewable energy certificates (RECs) from a solar project in a [&hellip;]","og_url":"https:\/\/dev.nvalue.com\/it\/market-news-it\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\/","og_site_name":"NVALUE","article_published_time":"2025-06-16T08:38:35+00:00","article_modified_time":"2025-07-30T09:41:13+00:00","og_image":[{"width":1100,"height":687,"url":"https:\/\/dev.nvalue.com\/wp-content\/uploads\/2025\/06\/shutterstock_2483865553_r_c.jpg","type":"image\/jpeg"}],"author":"marketing.nvalue","twitter_card":"summary_large_image","twitter_misc":{"Scritto da":"marketing.nvalue","Tempo di lettura stimato":"3 minuti"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/dev.nvalue.com\/it\/market-news-it\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\/#article","isPartOf":{"@id":"https:\/\/dev.nvalue.com\/it\/market-news-it\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\/"},"author":{"name":"marketing.nvalue","@id":"https:\/\/dev.nvalue.com\/it\/#\/schema\/person\/ede6234574f97b97951b73517ac97ca4"},"headline":"Nvalue\u2019s position regarding the Scope 2 Technical Working Group Progress Update","datePublished":"2025-06-16T08:38:35+00:00","dateModified":"2025-07-30T09:41:13+00:00","mainEntityOfPage":{"@id":"https:\/\/dev.nvalue.com\/it\/market-news-it\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\/"},"wordCount":883,"image":{"@id":"https:\/\/dev.nvalue.com\/it\/market-news-it\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\/#primaryimage"},"thumbnailUrl":"https:\/\/dev.nvalue.com\/wp-content\/uploads\/2025\/06\/shutterstock_2483865553_r_c.jpg","articleSection":["Market news"],"inLanguage":"it-IT"},{"@type":"WebPage","@id":"https:\/\/dev.nvalue.com\/it\/market-news-it\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\/","url":"https:\/\/dev.nvalue.com\/it\/market-news-it\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\/","name":"Nvalue\u2019s position regarding the Scope 2 Technical Working Group Progress Update - NVALUE","isPartOf":{"@id":"https:\/\/dev.nvalue.com\/it\/#website"},"primaryImageOfPage":{"@id":"https:\/\/dev.nvalue.com\/it\/market-news-it\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\/#primaryimage"},"image":{"@id":"https:\/\/dev.nvalue.com\/it\/market-news-it\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\/#primaryimage"},"thumbnailUrl":"https:\/\/dev.nvalue.com\/wp-content\/uploads\/2025\/06\/shutterstock_2483865553_r_c.jpg","datePublished":"2025-06-16T08:38:35+00:00","dateModified":"2025-07-30T09:41:13+00:00","author":{"@id":"https:\/\/dev.nvalue.com\/it\/#\/schema\/person\/ede6234574f97b97951b73517ac97ca4"},"breadcrumb":{"@id":"https:\/\/dev.nvalue.com\/it\/market-news-it\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\/#breadcrumb"},"inLanguage":"it-IT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/dev.nvalue.com\/it\/market-news-it\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\/"]}]},{"@type":"ImageObject","inLanguage":"it-IT","@id":"https:\/\/dev.nvalue.com\/it\/market-news-it\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\/#primaryimage","url":"https:\/\/dev.nvalue.com\/wp-content\/uploads\/2025\/06\/shutterstock_2483865553_r_c.jpg","contentUrl":"https:\/\/dev.nvalue.com\/wp-content\/uploads\/2025\/06\/shutterstock_2483865553_r_c.jpg","width":1100,"height":687},{"@type":"BreadcrumbList","@id":"https:\/\/dev.nvalue.com\/it\/market-news-it\/nvalues-position-regarding-the-scope-2-technical-working-group-progress-update\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/dev.nvalue.com\/it\/"},{"@type":"ListItem","position":2,"name":"Nvalue\u2019s position regarding the Scope 2 Technical Working Group Progress Update"}]},{"@type":"WebSite","@id":"https:\/\/dev.nvalue.com\/it\/#website","url":"https:\/\/dev.nvalue.com\/it\/","name":"NVALUE","description":"Certificati Energia Rinnovabile","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/dev.nvalue.com\/it\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"it-IT"},{"@type":"Person","@id":"https:\/\/dev.nvalue.com\/it\/#\/schema\/person\/ede6234574f97b97951b73517ac97ca4","name":"marketing.nvalue","url":"https:\/\/dev.nvalue.com\/it\/author\/marketing-nvalue\/"}]}},"_links":{"self":[{"href":"https:\/\/dev.nvalue.com\/it\/wp-json\/wp\/v2\/posts\/31683","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dev.nvalue.com\/it\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dev.nvalue.com\/it\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dev.nvalue.com\/it\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/dev.nvalue.com\/it\/wp-json\/wp\/v2\/comments?post=31683"}],"version-history":[{"count":0,"href":"https:\/\/dev.nvalue.com\/it\/wp-json\/wp\/v2\/posts\/31683\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dev.nvalue.com\/it\/wp-json\/wp\/v2\/media\/31675"}],"wp:attachment":[{"href":"https:\/\/dev.nvalue.com\/it\/wp-json\/wp\/v2\/media?parent=31683"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dev.nvalue.com\/it\/wp-json\/wp\/v2\/categories?post=31683"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dev.nvalue.com\/it\/wp-json\/wp\/v2\/tags?post=31683"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}